← All projects
ActiveWastewater
Replacement WWTP — Owner's Representative
City of Santa Fe · Santa Fe, NM
~6 MGD
Owner's Representative / Design-Basis Advisory
S3W provides professional consulting, owner's-representative, design-review, operational, regulatory, procurement, and safety support to help the City define the project scope and design basis for a Design-Build or Construction Management at Risk (CMAR) replacement of its approximately 6-MGD membrane bioreactor (MBR) wastewater treatment plant. The existing plant is more than 60 years old and serves roughly 87,200 residents.
Location
More work for City of Santa Fe
Planning a similar project?
Talk with the people who will design, build, and operate it.
