← All projects
ActiveWastewater
Santa Fe Opera WWTP — Operations & Maintenance
Santa Fe Opera · Santa Fe, NM
20,000 gpd
Operations & Maintenance
S3W provides monthly operations and maintenance for the Santa Fe Opera's 20,000-gallon-per-day membrane bioreactor (MBR) package wastewater treatment plant. The system comprises an MBR with membrane, aerobic, and anoxic chambers; two buried 20,000-gallon aerated equalization tanks; and three 10,000-gallon above-ground reclaimed-water storage tanks. S3W also provides time-and-materials support for work outside the routine O&M scope.
Location
Related projects
~6 MGD
ActiveWastewater
Replacement WWTP — Owner's Representative
City of Santa Fe
Owner's Representative / Design-Basis Advisory
2025–2027
Dwg · Treatment plant
ActiveWastewater
Paseo Real WWTP — On-Call O&M Support
City of Santa Fe
On-Call Operations & Maintenance
2025–2026
80,000 gpd
ActiveWastewater
Tesuque Casino WWTP — Operations & Maintenance
Tesuque Development Corporation · Santa Fe County
Operations & Maintenance
2025–2026
Planning a similar project?
Talk with the people who will design, build, and operate it.