
← All projects
Team experienceWastewater
San Ildefonso Pueblo Water Reclamation Facility
Pueblo de San Ildefonso · San Ildefonso Pueblo, NM
Team experienceDelivered by S3W's principals while at a prior firm. Shown to document the team's experience.
A membrane bioreactor (MBR) facility designed to be phased — beginning at 50,000 gpd to treat the existing Pueblo collection system and expandable to 200,000 gpd to collect and treat wastewater from El Rancho. The facility was designed to fit the community, with energy-efficient VFD pumps and integrated solar power, and treated effluent reused and/or returned to the Rio Grande for return-flow credits. Ewan Young has worked with San Ildefonso Pueblo for more than a decade; the treatment plant design was completed in 2018.
Location
Related projects
~6 MGD
ActiveWastewater
Replacement WWTP — Owner's Representative
City of Santa Fe
Owner's Representative / Design-Basis Advisory
2025–2027
Dwg · Treatment plant
ActiveWastewater
Paseo Real WWTP — On-Call O&M Support
City of Santa Fe
On-Call Operations & Maintenance
2025–2026
80,000 gpd
ActiveWastewater
Tesuque Casino WWTP — Operations & Maintenance
Tesuque Development Corporation · Santa Fe County
Operations & Maintenance
2025–2026
Planning a similar project?
Talk with the people who will design, build, and operate it.